A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed on the sander. To make a shoe, 10 mins is needed on the lathe and 20 mins on the sander. The lathe operator works 6hrs/day and the sander operator works 7hrs/day. How many shoes and boots can they make in one day working at this capacity. Write 2 equations.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Nick and nora are married and have three children in college. they have an adjusted gross income of 47,400. if their standard deduction is 12,600 itemized deductions are 14,200 and they get an exemption of 4000 for each adult and each dependent what is their taxable income
Answers: 3
question
Mathematics, 21.06.2019 19:50
Type the correct answer in each box. spell all words correctly. a sequence of transformations maps ∆abc onto ∆a″b″c″. the type of transformation that maps ∆abc onto ∆a′b′c′ is a . when ∆a′b′c′ is reflected across the line x = -2 to form ∆a″b″c″, vertex of ∆a″b″c″ will have the same coordinates as b′.
Answers: 1
question
Mathematics, 21.06.2019 20:00
Prove that the value of the expression 7^8–7^7+7^6 is divisible by 43.
Answers: 1
question
Mathematics, 21.06.2019 21:30
Aroulette wheel has 38 slots in which the ball can land. two of the slots are green, 18 are red, and 18 are black. the ball is equally likely to land in any slot. the roulette wheel is going to be spun twice, and the outcomes of the two spins are independent.the probability that it lands one time on red and another time on black in any order is(a) 0.5 (b) 0.25 (c) 0.4488 (d) 0.2244
Answers: 1
You know the right answer?
A shoe shop makes shoes and boots. To make boots, 8 mins is needed on the lathe and 8 mins is needed...
Questions
question
Mathematics, 16.02.2021 20:00
question
English, 16.02.2021 20:00
question
Spanish, 16.02.2021 20:00
question
Mathematics, 16.02.2021 20:00
question
Mathematics, 16.02.2021 20:00