subject
Mathematics, 03.02.2020 19:52 Arealbot

Zina spends 1.5 hours setting up her sewing machine and making one hat. the total amount of time spent making hats can be represented by the sequence below.

1.5, 2.25, 3.0, 3.75,

which recursive formula can be used to determine the total amount of time spent making hats based on the total amount of time spent previously?

a. f(n + 1) = f(n) + 1.5
b. f(n + 1) = f(n) + 0.75
c. f(n + 1) = f(n)
d. f(n + 1) = f(n)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
The midpoints of the sides of the large square are joined to form a smaller square. what is the area of the smaller square
Answers: 1
question
Mathematics, 21.06.2019 20:20
The surface area of the triangular prism is .
Answers: 1
question
Mathematics, 22.06.2019 01:00
Write as a product of two polynomials. 2(3–b)+5(b–3)^2
Answers: 1
question
Mathematics, 22.06.2019 04:30
Arandom sample of size n 64 is taken from a population with population proportion p 0.38 describe the sampling distribution of p. draw a graph of this probability distribution with its a. mean and standard deviation. b. what is the probability that the sample proportion is greater than 0.5? what is the probability that the sample proportion is less than 0.3? d. what is the probability that the sample proportion is between 0.35 and 0.45?
Answers: 1
You know the right answer?
Zina spends 1.5 hours setting up her sewing machine and making one hat. the total amount of time spe...
Questions
question
Mathematics, 15.04.2020 19:58
question
Mathematics, 15.04.2020 19:58
question
Mathematics, 15.04.2020 19:58