GREAT PRIZES ANSWER NOW!! 1.) a railroad construction crew can lay 1 1/4 mi of track in one day. at that rate, how many miles of track can be laid in 10 days?
2.) a railroad construction crew can lay 1 1/4 mi of track in one day. at that rate, how many days will it take to lay 10 miles

First correct answer gets: 5 stars and a thanks on this question, thanks and 5 stars on 5 question on your choice, brainliest on this question, and a friend request, and also... a thanks on your profile!

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
1) in triangle the, what is the measure of angle t (in degrees)? 2) in triangle bat, the measure of angle b is 66∘, and the measure of angle t is 77∘.what is the measure of the exterior angle at a (in degrees)?
Answers: 1
question
Mathematics, 21.06.2019 20:30
Secant be and cf intersect at point d inside a what is the measure of cde
Answers: 1
question
Mathematics, 21.06.2019 22:30
Marquise has 200 meters of fencing to build a rectangular garden. the garden's area (in square meters) as a function of the garden's width w w (in meters) is modeled by: a ( w ) = − w 2 + 1 0 0 w a(w)=−w 2 +100w what side width will produce the maximum garden area? meters
Answers: 1
question
Mathematics, 22.06.2019 00:00
Apassenger train and a freight train leave san jose at 3pm, traveling in the same direction. the passenger train is going three times as fast as the freight train. at 6pm they are 240 miles apart. how fast is each travelling? explain your answer and show your
Answers: 1
You know the right answer?
GREAT PRIZES ANSWER NOW!! 1.) a railroad construction crew can lay 1 1/4 mi of track in one day. at...
Questions
question
Engineering, 06.02.2022 14:00
question
Mathematics, 06.02.2022 14:00
question
Mathematics, 06.02.2022 14:00
question
Mathematics, 06.02.2022 14:00