subject
Mathematics, 08.11.2020 05:30 taylorbean315

A construction company can remove 1/3 metric tons of dirt from a construction site in 1/6
hours.
What is the unit rate in metric tons per hour?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
20+ ! come and answer quick! triangle mno is reflected over the x-axis and then translated up 4 and right 3. how can the transformation be amended such that the translation can occur before the reflection and have the image remain in the same position? a translate the pre-image down 4 and right 3 and then reflect the figure over the x-axis. b translate the pre-image up 3 and right 4 and then reflect the figure over the x-axis. c translate the pre-image up 4 and left 3 and then reflect the figure over the y-axis. d translate the pre-image down 3 and right 4 and then reflect the figure over the x-axis.
Answers: 2
question
Mathematics, 21.06.2019 16:40
Question 10jur's car can travel 340 miles on 12 gallons. jack's car can travel 390 miles on16 gallons. which person has the best mileage (miles per gallon) and what istheir mileage?
Answers: 1
question
Mathematics, 21.06.2019 20:20
Abag contains 3 red marbles, 2 blue marbles, and 2 green marbles. one marble is picked, then another marble. assume that the selections are made with replacement. a) find the probability of picking two red marbles with replacement. b) find the probability of picking a red marble and a blue marble. assume the selections are made without replacement. c) find the probability of picking two red marbles without replacement. d) find the probability of picking a red marble and a blue marble without replacement.
Answers: 1
question
Mathematics, 21.06.2019 20:30
Someone answer asap for ! michele pushes a box d meters across a floor. she uses a force f, in newtons, to push the box. she pushes the box for t seconds. the formula p = fd/t calculates the power, p, in watts, that it takes for michele to complete the task. solve the formula for d.
Answers: 2
You know the right answer?
A construction company can remove 1/3 metric tons of dirt from a construction site in 1/6
hou...
Questions
question
Mathematics, 16.01.2022 05:50
question
Physics, 16.01.2022 05:50
question
Mathematics, 16.01.2022 06:00