subject
Mathematics, 06.11.2020 17:10 heroxtree

A construction company is setting up signs on a 6 3/4 mile stretch of road. If the company places a sign every 3/4 of a mile, how many signs will it need? Note: the company will place a Sign at the beginning of the stretch,
then every 3/4 of a mile.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Δabc is dilated by a scale factor of 3 with the origin as the center of dilation to form δa′b′c′. the slope of is -1.2. the length of is p units, the length of is q units, and the length of is r units. the slope of is . the length of is units.
Answers: 2
question
Mathematics, 21.06.2019 19:00
[10 points, algebra 2]according to my answer key the restrictions are -1 and 4. but why not positive 1?
Answers: 1
question
Mathematics, 21.06.2019 20:30
What is the difference between the equations of a vertical and a horizontal line?
Answers: 2
question
Mathematics, 22.06.2019 00:00
Find the length of the normal and the angle it makes with the positive x-axis. (see pictured below)
Answers: 1
You know the right answer?
A construction company is setting up signs on a 6 3/4 mile stretch of road. If the company places a...
Questions
question
Mathematics, 27.06.2019 01:10