subject
Mathematics, 05.11.2020 19:10 munao4938

A project has each of the following characteristics except . A. Clearly defined scope, deliverables, and results.
B. An estimated budget that is subject to a high degree of uncertainty.
C. Low risk with a high profit potential or benefits.
D. An estimated time frame or schedule that is subject to a high degree of uncertainty.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
"princess tower" in dubai is considered the world's tallest residential building, towering to 1 0 1 101 floors! t ( n ) t(n) models the number of tenants living on floor n n of the tower. what does the statement t ( 2 0 ) = t ( c ) t(20)=t(c) mean?
Answers: 2
question
Mathematics, 21.06.2019 18:20
The first-serve percentage of a tennis player in a match is normally distributed with a standard deviation of 4.3%. if a sample of 15 random matches of the player is taken, the mean first-serve percentage is found to be 26.4%. what is the margin of error of the sample mean? a. 0.086% b. 0.533% c. 1.11% d. 2.22%
Answers: 1
question
Mathematics, 21.06.2019 23:00
The angles in a triangle are represented by 5x, 8x, and 2x+9. what is the value of ? a.10.8 b.11.4 c.9.7 d.7.2
Answers: 2
question
Mathematics, 21.06.2019 23:10
Determine the required value of the missing probability to make the distribution a discrete probability distribution. x p(x) 3 0.23 4 ? 5 0.51 6 0.08 p(4) = nothing  (type an integer or a decimal.)
Answers: 3
You know the right answer?
A project has each of the following characteristics except . A. Clearly defined scope, deliverables...
Questions
question
Mathematics, 08.01.2020 01:31