subject
Mathematics, 30.10.2020 17:30 ketabug50

Efficiency Studies A division of a certain toy company manufactures an electronic football game. An efficiency study showed that the rate at which the games are assembled by the average worker t hr after starting work at 8 A. M. is− 32t2 + 4t + 25 (0 ≤ t ≤ 4)units/hour.(a)Find the total number of games the average worker can be expected to assemble in the 4 hr morning shift. units(b)How many units can the average worker be expected to assemble in the first hour of the morning shift? unitsHow many units can the average worker be expected to assemble in the second hour of the morning shift? units

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
In a probability experiment, karen flipped a coin 76 times. the coin landed on heads 32 times. what percentage of the coin flips resulted in tails? round to the nearest percent. a. 58% b. 65% c. 42% d. 60%
Answers: 2
question
Mathematics, 21.06.2019 18:00
Sandy is ordering bread rolls for her party,she wants 3/5 of the rolls to be whole wheat. what other factions can represent part of the rolls that will be whole wheat? shade the models to show your work.
Answers: 1
question
Mathematics, 21.06.2019 18:30
Sasha drank 8 bottles of water everyday for a week. how many bottles of water did she drink in total?
Answers: 2
question
Mathematics, 21.06.2019 18:30
(05.08a)triangle abc is transformed to similar triangle a′b′c′ below: a coordinate plane is shown. triangle abc has vertices a at 2 comma 6, b at 2 comma 4, and c at 4 comma 4. triangle a prime b prime c prime has vertices a prime at 1 comma 3, b prime at 1 comma 2, and c prime at 2 comma 2. what is the scale factor of dilation? 1 over 2 1 over 3 1 over 4 1 over 5
Answers: 3
You know the right answer?
Efficiency Studies A division of a certain toy company manufactures an electronic football game. An...
Questions
question
Mathematics, 23.03.2020 16:32
question
Mathematics, 23.03.2020 16:33