subject
Mathematics, 27.10.2020 03:20 Shazrts2371

Two groups of workers are painting a bridge in the bay. The first group is responsible for painting the north side of the bridge, and the second group is responsible for painting the
south side of the bridge. The first group has already painted 5 kilometers of the bridge and is
painting 2 additional kilometers per day. The second group has already painted 1 kilometer of
the bridge and is painting 4 additional kilometers per day. After a while, the two groups will
have painted the same amount of the bridge. How much of the bridge will each group have
painted? How long will that take?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Answer asap ! the shortest path from point a to point b goes through a pond. to avoid the pond, you must walk straight 34 meters along one edge of the pond, then take a 90 degree turn, and again walk straight 41 meters along another edge of the pond to reach point b. about how many meters would be saved if it were possible to walk through the pond? a. 11 m b. 20 m c. 30.45 m d. 21.73 m
Answers: 1
question
Mathematics, 21.06.2019 21:20
If the value of cos330°is√3/2 then find cos 165°.
Answers: 2
question
Mathematics, 22.06.2019 04:00
Iwill mark ad braniless pls just evens
Answers: 2
question
Mathematics, 22.06.2019 04:00
Robin and john each a a 12 inch pizza about how many square inches of pizza did they eat? estimate how much pizza they ate
Answers: 2
You know the right answer?
Two groups of workers are painting a bridge in the bay. The first group is responsible for painting...
Questions
question
Arts, 06.05.2021 21:20
question
Mathematics, 06.05.2021 21:20
question
Mathematics, 06.05.2021 21:20
question
English, 06.05.2021 21:20
question
Mathematics, 06.05.2021 21:20
question
Chemistry, 06.05.2021 21:20
question
English, 06.05.2021 21:20
question
Mathematics, 06.05.2021 21:20