subject
Mathematics, 26.10.2020 16:40 whatsittoya4261

One machine can complete a production run at a factory in 46 hours. Two machines can complete the production run in 25 hours if they work-together. How long would it take the second machine to complete the production run if it had to do the job by itself?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
The function models the number of accidents per 50 million miles driven as a function
Answers: 1
question
Mathematics, 21.06.2019 21:00
Use the following random list of 100 numbers and the same assignations as in the example (0-4 represent girls and 5-9 represent boys) to answer the questions below. 3199 9288 1023 1130 0809 1770 6231 7538 8927 4761 7258 7111 0209 0916 1450 9848 4654 7579 6150 3093 9608 0061 4014 9501 0382 3052 2385 9074 1664 6551 6577 1811 3454 5870 1277 5056 1063 5697 9141 4120 9181 1343 0168 3693 0463 4842 1704 3774 4908 4161 6404 9675 2518 3988 4268 6083 0636 9634 5295 5656 1918 3133 6831 8393 6363 2452 1531 1638 1317 2279 9395 0702 2091 5269 0422 0275 3373 1424 1958 0356 5163 0743 6658 6257 2772 0570 4522 2665 0890 3560 5549 2238 2172 9715 9741 4975 6617 9034 4441 8220 based on the results of the second simulation, what is the experimental probability that a group will include only boys? based on the results of the second simulation, what is the experimental probability that a group will not contain four boys?
Answers: 2
question
Mathematics, 21.06.2019 23:30
Alex's monthly take home pay is $2,500. what is the maximum bad debt payment he can maintain without being in credit overload?
Answers: 2
question
Mathematics, 22.06.2019 02:20
Stu and ambrose are working together on a study of whether diet is related to students' mental health. first, they randomly select 10 students from the student center and 10 students from the office of counseling and psychological services. then, they ask students to rate their diet in terms of healthiness on a scale of 1-100 before completing a 20-item mental health survey. a) name one of the constructs being studied b) how was the construct you named above operationally defined in this experiment? e) was the variable you described above their independent variable, their dependent variable, or a controlled variable? d) what is a confounding variable? what is a potential confound in this study?
Answers: 3
You know the right answer?
One machine can complete a production run at a factory in 46 hours. Two machines can complete the p...
Questions
question
English, 05.09.2020 23:01