In order to ensure the quality of concrete material used in a reinforced concrete construction, concrete cylinders are collected at random for concrete mixes delivered to the construction site by a mixing plant. Past records of concrete from the same plant show that 80% of concrete mixtures are of satisfactory quality. To further insure that the concrete delivered on site is of good quality, the engineer requires that one cylinder among those collected each day to be tested for 7-day compressive strength. The method's reliability is 90%. That is, the probability that a good quality concrete will pass the test is 0.90, while the probability that a poor-quality cylinder will pass the test is 0.10. a. Define all events of interest. (3 pts.)
b. Extract all relevant information from the problem using the notation in 7(a). (6 pts.)
c. Provide a graphical representation of the sample space. (10 pts.)
d. Use set notation to describe all outcomes in the sample space. (5 pts.)
e. If a concrete cylinder passes the test, what is the probability that good-quality concrete was delivered on site? (8 pts.)
f. What is the probability that a cylinder either fails the test or is of good quality? (8 pts.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
What is the exact volume of the cylinder (radius 13 in., height 30 in.)
Answers: 1
question
Mathematics, 21.06.2019 17:00
Use the expression below.–4b + 8c + 12 – 8b – 2c + 6part asimplify the expression. enter your answers in the boxes. b + c + part bfactor the simplified expression using the gcf. a. 2(–2b + c + 3) b. 3(–2b + c + 3) c. 4(–2b + c + 3) d. 6(–2b + c + 3)part cwhat is the value of the expression when b = 2 and c = –3? enter your answer in the box.
Answers: 1
question
Mathematics, 21.06.2019 17:30
The sum of two numbers is 12 and their difference is 18 what are the two numbers
Answers: 1
question
Mathematics, 21.06.2019 19:00
Daniel expanded the expression as shown below -2(-8x-4y+3/4)=-10x-8y-11/4 what errors did he make? check all that apply
Answers: 3
You know the right answer?
In order to ensure the quality of concrete material used in a reinforced concrete construction, conc...
Questions