A project manager is calculating work forecasts. The manager’s team completed of a job in 16 days. At this rate, the manager says that the team completed of the project each day. What was the manager’s error?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Can someone check if i did this right since i really want to make sure it’s correct. if you do you so much
Answers: 1
question
Mathematics, 21.06.2019 19:20
Which number line represents the solution set for the inequality - x 24?
Answers: 3
question
Mathematics, 21.06.2019 20:30
Someone answer asap for ! a ball is rolled down a ramp. the height, f(x), in meters, of the ball x seconds after it is released is modeled by the function f(x) = x²- 10x + 25 for all values of x from 0 to 5. which statement about the ball is true? a. the maximum height of the ball is 5 meters b. the height of the ball increases from 0 to 5 meters above the ground. c. the ball has traveled 5 meters when it reaches the bottom of the ramp. d. the ball has been traveling for 5 seconds when it reaches the bottom of the ramp
Answers: 1
question
Mathematics, 21.06.2019 23:00
Find the rate at which the water is now flowing from the tap give your answer cubic centimetres per second
Answers: 1
You know the right answer?
A project manager is calculating work forecasts. The manager’s team completed of a job in 16 days. A...