subject
Mathematics, 13.10.2020 15:01 PinkDivaGirl02

A clothing manufacturer makes coats, shirts, and slacks. The time required for cutting, sewing, and packaging each item is shown in the table. How many of each should be made to use all available labor hours?
coats
shirts
slacks
Coats
Shirts
Slacks
20 min
15 min
Cutting
Sewing
Packaging
10 min
24 min
Time available
135 hr
320 hr
81 hr
60 min
30 min
5 min
12 min
6 min
ges/Alamy

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Three coins are flipped. what is the probability that there will be at least two tails?
Answers: 1
question
Mathematics, 21.06.2019 19:00
You give a $4 tip for a meal that cost $22. approximately what percent of the bill was your tip?
Answers: 1
question
Mathematics, 21.06.2019 19:00
Stefano accidentally dropped his sunglasses off the edge of a canyon as he was looking down. the height, h(t), in meters (as it relates to sea level), of the sunglasses after t seconds, is shown in the table. during its descent, the pair of sunglasses passed by a climber in the canyon 6 seconds after stefano dropped them. to the nearest meter, what is difference in elevation between stefano and the climber? 166 meters 176 meters 230 meters 240 meters its b.176 i took the test 166 is wrong and 176 is correct
Answers: 1
question
Mathematics, 21.06.2019 19:00
Asap its important using the information in the customer order, determine the length and width of the garden. enter the dimensions.length: feetwidth: feet
Answers: 3
You know the right answer?
A clothing manufacturer makes coats, shirts, and slacks. The time required for cutting, sewing, and...
Questions