Mathematics, 29.09.2020 20:01 klanclos1620
You are a contractor and charge 45 dollars for a site visit plus an additional 24 dollars each hour you spend working at the site. Use the equation i+rt=c.
For part A- Solve for t
Part B- use the equation from part a to find how hours the contractor needed to work at 2 sites to earn a total of $825
Answers: 3
Mathematics, 21.06.2019 17:00
Somone me i want to know what 18 hours out of 24 hours in a fraction
Answers: 1
Mathematics, 22.06.2019 00:00
What is the value of x in this triangle? a. 53° b. 62° c. 65° d. 118°
Answers: 2
Mathematics, 22.06.2019 02:30
Aconstruction worker needs to put a rectangular window in the side of a building he knows from measuring that the top and bottom of the window have a width of 8bfeet and the sides have a length of 15 feet he also measured one diagonal to be 17 feet what is the length of the other diagonal
Answers: 1
You are a contractor and charge 45 dollars for a site visit plus an additional 24 dollars each hour...