subject
Mathematics, 24.09.2020 21:01 henrygrubb554

The UMass IIE student chapter is going to run a fundraising event from 1pm through 5pm. Due to the large scale of the event, student workers will be hired to work for the event and each worker will be assigned to a particular shift. There are three shifts: 1pm-3pm, 2pm-4pm, 3pm-5pm. The pay for each of the three shifts is $20, $24 and $28 per worker respectively. The minimum number of workers needed for each hour is listed below: 1pm-2pm: 20, 2pm-3pm: 25, 3pm-4pm: 25, 4pm-5pm: 30. ASCE would like to minimize the hiring cost while satisfying the demand of workers in each hour. A) Define the decision variables.
B) Write down the objective function.
C) Write down the constraint that the demand of workers for 2pm-3pm is satisfied.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Asmall business produces and sells balls. the fixed costs are $20 and each ball costs $4.32 to produce. each ball sells for $8.32. write the equations for the total cost, c, and the revenue, r, then use the graphing method to determine how many balls must be sold to break even.
Answers: 1
question
Mathematics, 21.06.2019 22:30
Pls never taught i’m really confused and i rlly need
Answers: 1
question
Mathematics, 21.06.2019 23:00
Eric drove 275 miles in 5 hours. at the same rate how long would it take him to drive 495 miles?
Answers: 2
question
Mathematics, 21.06.2019 23:20
Which expression is a factor of 12x2 + 29x – 8? x – 8 2x – 1 3x + 8 4x + 1
Answers: 1
You know the right answer?
The UMass IIE student chapter is going to run a fundraising event from 1pm through 5pm. Due to the l...
Questions
question
English, 21.10.2020 15:01
question
Health, 21.10.2020 15:01
question
Mathematics, 21.10.2020 15:01
question
Mathematics, 21.10.2020 15:01
question
Mathematics, 21.10.2020 15:01
question
Mathematics, 21.10.2020 15:01