subject
Mathematics, 24.09.2020 02:01 TheChosenOne9050

A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: Sample Service Life (hours) 1 495 500 505 500 2 525 515 505 515 3 470 480 460 470 If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Find the required measurements of the following trapezoids. a = 8 cm b = 16 cm h = 10 cm
Answers: 2
question
Mathematics, 21.06.2019 17:30
Lindsay used two points, (x,y; ) and (+2.82), to find the equation of the line, y = mx + b, that passes through the points. y2-y, first, she used the definition of slope and determined that the value of mis x, - . given this information, which expression must represent the value of b?
Answers: 2
question
Mathematics, 21.06.2019 22:00
Find the maximum value of p= 4x + 5y subject to the following constraints :
Answers: 1
question
Mathematics, 21.06.2019 23:00
John has 1/2 pound of oranges to share with julie. if they share the oranges equally, how much will each of them have?
Answers: 1
You know the right answer?
A design engineer wants to construct a sample mean chart for controlling the service life of a halog...
Questions
question
Mathematics, 24.10.2020 01:50
question
Mathematics, 24.10.2020 01:50
question
Computers and Technology, 24.10.2020 01:50
question
Mathematics, 24.10.2020 01:50
question
Mathematics, 24.10.2020 01:50
question
History, 24.10.2020 01:50
question
History, 24.10.2020 01:50