subject
Mathematics, 22.09.2020 22:01 candycrush24

A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company manufactures the shafts and frames but purchases the ball bearings from a ball bearing manufacturer. Each shaft must be processed on a forging machine, a lathe, and a grinder. These operations require 0.6 hour, 0.3 hour, and 0.4 hour per shaft, respectively. Each frame requires 0.8 hour on a forging machine, 0.2 hour on a drilling machine, 0.3 hour on a milling machine, and 0.6 hour on a grinder. The company has 5 lathes, 10 grinders, 20 forging machines, 3 drillers, and 6 millers. Assume that each machine operates a maximum of 4500 hours per year. Required:
Formulate the problem of finding the maximum number of assembled components that can be produced as a linear program.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
How do you find the area of a triangle
Answers: 1
question
Mathematics, 21.06.2019 21:30
A.s.a.! similarity in right triangles, refer to the figure to complete this proportionc/a = a/? a.) cb.) hc.) rd.) s
Answers: 1
question
Mathematics, 21.06.2019 22:30
Agallon of apple juice cost $7 a pack of eight 4.23oz box of apple juice $2.39 which is a better deal
Answers: 1
question
Mathematics, 21.06.2019 23:30
Find the measure of angle y. round your answer to the nearest hundredth. ( type the numerical answer only) a right triangle is shown with one leg measuring 5 and another leg measuring 14. an angle across from the leg measuring 5 is marked y degrees. numerical answers expected!
Answers: 1
You know the right answer?
A company manufactures an assembly consisting of a frame, a shaft, and a ball bearing. The company m...
Questions
question
Mathematics, 03.04.2021 06:50
question
Mathematics, 03.04.2021 06:50
question
Mathematics, 03.04.2021 06:50
question
Mathematics, 03.04.2021 06:50