Mathematics, 20.09.2020 03:01 pierreangie17
It was calculated that 75 men can complete a piece of work in 20 days. when work was scheduled to commence, it was found necessary to send 25 men to another project. how much longer will it take to complete the work?
Answers: 3
Mathematics, 21.06.2019 18:30
Atriangle with all sides of equal length is a/an triangle. a. right b. scalene c. equilateral d. isosceles
Answers: 2
Mathematics, 21.06.2019 20:30
Select all the expressions that will include a remainder.
Answers: 1
Mathematics, 21.06.2019 21:00
Julie buys 2kg of apples and 7kg of pears ? 12.70. the pears cost ? 1.30 per kilogram what is the price per kilogram of the apples? show your working out
Answers: 2
Mathematics, 21.06.2019 23:50
Astudent draws two parabolas both parabolas cross the x axis at (-4,0) and (6,0) the y intercept of the first parabolas is (0,-12). the y intercept of the second parabola is (0,-24) what is the positive difference between the a values for the two functions that describe the parabolas
Answers: 3
It was calculated that 75 men can complete a piece of work in 20 days. when work was scheduled to co...
Biology, 29.01.2021 01:00
History, 29.01.2021 01:00
English, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Mathematics, 29.01.2021 01:00
Physics, 29.01.2021 01:00