subject
Mathematics, 21.08.2020 14:01 nwalker916

Mr. Johnson hired a contractor to build a small deck on the back of his house. The cost of materials alone added to $678.12. When he received the final bill from the contractor, the total amount charged was $1206.12. Verify the accuracy of this bill if labor amounted to 16.5 hours at $32 an hour

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
The lines shown below are parallel. if the green line has a slope of -1, what is the slope of the red line
Answers: 2
question
Mathematics, 21.06.2019 18:00
When lulu enlarged her drawing of a rabbit, the enlarged picture appeared to be distorted. which statement about the transformation applied to her drawing is true?
Answers: 2
question
Mathematics, 21.06.2019 23:20
This graph shows which inequality? a ≤ –3 a > –3 a ≥ –3 a < –3
Answers: 1
question
Mathematics, 22.06.2019 00:30
Given abc find the values of x and y. in your final answer, include all of your calculations.
Answers: 1
You know the right answer?
Mr. Johnson hired a contractor to build a small deck on the back of his house. The cost of materials...
Questions
question
Chemistry, 24.09.2019 03:00
question
Mathematics, 24.09.2019 03:00
question
Chemistry, 24.09.2019 03:00