subject
Mathematics, 20.08.2020 20:01 dheydar9377

The structural engineering design section within the engineering department of a regional electrical utility corporation has developed several standard designs for a group of similar transmission line towers. The detailed design for each tower is based on one of the standard designs. A transmission line project involving 50 towers has been approved. The estimated number of engineering hours needed to accomplish the 8 th and 50th tower are 108 hours and 94.3 hours respectively. Determine the learning curve percentage and estimate of the number of engineering hours needed to design the 10th tower in the project

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
Ivan began dividing g2  – 6 by g + 1, noting that . he started by placing g in the quotient, as shown below.what is g2  – 6 divided by g + 1? g –  1 –  g + 1  – g  –  7 + g  –  5  + 
Answers: 3
question
Mathematics, 21.06.2019 18:00
Solve 2^x=32 and rewrite this equation in a logarithmic form
Answers: 2
question
Mathematics, 21.06.2019 18:00
Someone this asap for a group of students attends a basketball game. * the group buys x hot dogs at the concession stand for $2 each. * the group buys y drinks at the concession stand for $3 each. the group buys 29 items at the concession stand for a total of $70. how many hot dogs did the group buy?
Answers: 1
question
Mathematics, 22.06.2019 00:50
To diagonalize an nxn matrix a means to find an invertible matrix p and a diagonal matrix d such that a pdp d p ap or [1 3 dh epap 3 let a=-3 -5 -3 3 3 1 step 1: find the eigenvalues of matrix a "2's" step 2: find the corresponding eigenvectors of a step 3: createp from eigenvectors in step 2 step 4 create d with matching eigenvalues.
Answers: 3
You know the right answer?
The structural engineering design section within the engineering department of a regional electrical...
Questions