subject
Mathematics, 18.08.2020 19:01 ana9340

5. Jonathan and Victoria can finish a job in 13 days. Jonathan can do the job himself in 26 days. if Victoria wanted to do the job alone, how long would it
take her?
6. If a certain job can be finished by 18 workers in 26 days. How many workers
are needed to finish job in 12 days?
.
7. A group of 40 workers can finish digging a tunnel in 12 days. how many
workers can finish the job in 8 days?


5. Jonathan and Victoria can finish a job in 13 days. Jonathan can do the job

himself in 26 days.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Simplify the expression. -2/5(10+15m-20n)
Answers: 1
question
Mathematics, 21.06.2019 23:30
Asinusoidal function whose frequency is 1/6pi
Answers: 2
question
Mathematics, 21.06.2019 23:30
Which two fractions are equivalent to 24/84? 6/42 and 2/7 6/21 and 2/6 12/42 and 3/7 12/42 and 2/7
Answers: 1
question
Mathematics, 22.06.2019 01:50
Our star pitcher, foster enlight, can throw a pitch so fast that it gets to the catcher’s mitt before it leaves foster’s fingers! if the team wins a game then the probability that foster was pitching is 0.8 but only if foster had at least one day’s rest since his last pitching assignment. if foster does not have a day off and the team still wins, the probability that foster was pitching drops by half of what it was on the previous day. if the team wins three games in succession from the toronto tachyons and foster pitched in game #2, what is the probability that he pitched in one or more of the other games? (assume that foster did not pitch on the day before the first game of this three game series.)
Answers: 1
You know the right answer?
5. Jonathan and Victoria can finish a job in 13 days. Jonathan can do the job himself in 26 days. i...
Questions