subject
Mathematics, 31.07.2020 01:01 rar79

To estimate the long-term settlement of a footing, a geotechnical engineer uses the total load on the footing calculated by summing the dead load of the structure and the live load (loads imposed by furniture and occupancy). Because each is the sum of many relatively small weights, the engineer assumes that the dead load (X) and the live load (Y) are normally distributed. He collected data from numerous buildings of a similar type and found that the mean and the standard deviation of X are 100 kips and 10 kips, respectively, and the mean and the standard deviation of Y are 40 kips and 10 kips, respectively. Assuming that the design load is the total load for which the exceeding probability is 5%. Determine the design load.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Trevor and marissa together have 26 t-shirts to sell. if marissa has 6 fewer tshirts that trevor, find hiw many tshirts trevor has. identify the if-than moves in your solution
Answers: 1
question
Mathematics, 21.06.2019 15:00
With these: 18/36 = 1/? missing number change 1 5/8 to improper fraction. change 19/5 to a mixed number.
Answers: 1
question
Mathematics, 21.06.2019 15:30
Evaluate-27 ^4/3/8 a) - 81/16 b) 81/16 c) 16/81
Answers: 2
question
Mathematics, 21.06.2019 16:30
What could explain what happened when the time was equal to 120 minutes
Answers: 2
You know the right answer?
To estimate the long-term settlement of a footing, a geotechnical engineer uses the total load on th...
Questions
question
Mathematics, 14.04.2020 16:00
question
Mathematics, 14.04.2020 16:00
question
Mathematics, 14.04.2020 16:00