A contractor originally estimated the total cost of a job including labor and materials at $ 57,000. In reviewing the costs, a new estimate of $ 48,000 is made, reducing the labor cost by 15% and the material cost by 18%. What is each cost, labor and material, of the new estimate?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
How do you answer this question? (step by step)
Answers: 3
question
Mathematics, 21.06.2019 22:10
On a piece of paper, graph y< x-1. then determine which answer choicematches the graph you drew.13. z3. 2(3.290-1)
Answers: 2
question
Mathematics, 22.06.2019 00:10
What is the best estimate of the length of a football
Answers: 1
question
Mathematics, 22.06.2019 01:30
What rule describes a dilation with a scale factor of 4 and the center of dilation at the origin?
Answers: 1
You know the right answer?
A contractor originally estimated the total cost of a job including labor and materials at $ 57,000....
Questions