subject
Mathematics, 24.07.2020 01:01 anzeller6363

In an assembly line where the cycle time is 3 minutes and the sum of the task times is 22 minutes, what is the daily production rate in units for an 8-hour work-day

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 12:50
What values of data might affect the statistical measures of spread and center
Answers: 1
question
Mathematics, 21.06.2019 18:00
Aman is 6 feet 3 inches tall. the top of his shadow touches a fire hydrant that is 13 feet 6 inches away. what is the angle of elevation from the base of the fire hydrant to the top of the man's head?
Answers: 1
question
Mathematics, 21.06.2019 22:50
On the first of each month sasha runs a 5k race she keeps track of her times to track her progress her time in minutes is recorded in the table
Answers: 1
question
Mathematics, 22.06.2019 01:00
Anew landowner is interested in constructing a fence around the perimeter of her property. her property is 1,080√30 feet wide and 500√20 feet long. what is the perimeter of the property? (recall that the perimeter is the sum of each side of a shape or boundary). a 1,580√40 feet b. 5,320√5 feet c. 3,160√20 feet d. 10,640√5 feet
Answers: 3
You know the right answer?
In an assembly line where the cycle time is 3 minutes and the sum of the task times is 22 minutes, w...
Questions