Mathematics, 08.07.2020 23:01 angelashaw449
(i) You are the cost Engineer for a construction company in charge of building a new
bridge. The construction company will be penalized each day of delay in
construction for bridge. The penalty will be $4500 for the first day and will increase
by $12000 for each following day. Based on its budget, the company can afford to
pay a maximum of $ 155000 toward penalty. By modelling this as an arithmetic
progression, find the maximum number of days by which the completion of work can
be delayed.
Answers: 3
Mathematics, 21.06.2019 14:30
Ablock of wood is a cube whose side is x in. long. you cut off a 1-inch thick piece from the entire right side. then you cut off a 3-inch thick piece from the entire top of the remaining shape. the volume of the remaining block is 2,002 in3. what are the dimensions of the original block of wood?
Answers: 2
Mathematics, 21.06.2019 16:20
Under normal conditions, 1.5 feet of snow will melt into 2 inches of water. during a winter season high in the mountains, 301 feet of snow fell. how many inches of water will there be when the snow melts?
Answers: 1
Mathematics, 21.06.2019 21:00
The zoo collects $9.60 for every 24 tickets sold. how much will be collected for 400 tickets?
Answers: 2
Mathematics, 21.06.2019 23:00
The length of an intercepted arc of a central angle of a circle is 4 cm. if the radius of the circle is 5 cm what is the measurement of the central angle to the nearest whole degree
Answers: 2
(i) You are the cost Engineer for a construction company in charge of building a new
bridge. The co...
Computers and Technology, 17.12.2021 04:50
Mathematics, 17.12.2021 04:50
Mathematics, 17.12.2021 04:50
Mathematics, 17.12.2021 04:50
History, 17.12.2021 04:50
Computers and Technology, 17.12.2021 04:50
History, 17.12.2021 04:50