A construction company needs to remove 2 5/6 tons of dirt from a construction site. They can remove 3/10 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
You are studying different function tools and begin working with this function y=-160-9(x) use the equation to answer the question y=-160-9(x) what is the y value when x equals -13? y=-160-9(x)
Answers: 1
question
Mathematics, 21.06.2019 14:40
Simplify.7x + 3y - 2 + 6x + 1 + y squared 2 you! ; )
Answers: 1
question
Mathematics, 21.06.2019 20:00
The boiling point of water at an elevation of 0 feet is 212 degrees fahrenheit (°f). for every 1,000 feet of increase in elevation, the boiling point of water decreases by about 2°f. which of the following represents this relationship if b is the boiling point of water at an elevation of e thousand feet? a) e = 2b - 212 b) b = 2e - 212 c) e = -2b + 212 d) b = -2e + 212
Answers: 1
question
Mathematics, 21.06.2019 21:30
Apool measures 100 meters by 100 meters a toddler inside the pool and trows a ball 60 centimeters from one edge of the pool.how far is the ball from the opposite edge of the pool
Answers: 1
You know the right answer?
A construction company needs to remove 2 5/6 tons of dirt from a construction site. They can remove...
Questions
question
Mathematics, 10.03.2021 17:40
question
Mathematics, 10.03.2021 17:40