subject
Mathematics, 23.06.2020 19:01 Serenitybella

A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston, MA for 150 million dollars. A similar treatment plant with is planned for construction in 2025 in Springfield, MA. The new plant will have a capacity of 30 mgd. Determine the following:A) The estimated cost of the new treatment plant in 1990 dollars. Use Cost Capacity Factor Method and assume p = .75. Assume city-cost indices are: Boston = 115, Springfield = 102. (5) B) The estimated cost of the new treatment plant in 2025 dollars. According to the 2025 projected cost index = 235.6 and the historical cost index for 1990 was 94.3.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
1c) the number 131 is a term in the sequence defined by the explicit rule f(n)=5n-4. which term in the sequence is 131? 2a) write the first four terms of the function f(n)=n^2-1 2b) what is the 10th term of the sequence defined by the explicit rule f(n)=n^2-1 2c) the number 224 is a term in the sequence defined by the explicit rule f(n)=n^2-1. which term in the sequence is 224?
Answers: 2
question
Mathematics, 21.06.2019 20:30
If g^-1(x) is the inverse of g (x) which statement must be true
Answers: 3
question
Mathematics, 21.06.2019 23:40
The bolo cavern outside of vandalia is 421 ft below sea level. a little more than75 miles away. mt owens is 7295 feet above sea level. what is the difference in elevation between the bolo cavern and mt owens?
Answers: 1
question
Mathematics, 21.06.2019 23:50
You so much whoever answers with accuracy •the parent function of the graph of f(x) is the square root function, which was reflected across the x-axis. which of the following is the equation of f(x)?
Answers: 1
You know the right answer?
A 50 million gallon per day (mgd) sanitary water treatment plant was constructed in 1990 at Boston,...
Questions