Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C averages 40 picks per hour. [20 points] a. If the 3 workers work in a bucket brigade, in which order the workers should be arranged?
b. If the average order requires 100 picks, what would be the average rate of order completion of the team under bucket brigades?
c. Assume the 3 workers are assigned into zones with equal work in each. What is the average rate of order completion of the team when the workers are arranged in A à B à C order?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
Given f(x) = x − 7 and g(x) = x2 . find g(f( g(f(4))
Answers: 1
question
Mathematics, 21.06.2019 15:30
John bought 2 horses at rs 20000 each
Answers: 1
question
Mathematics, 22.06.2019 02:00
Nina has prepared the following two-column proof below. she is given that ∠oln ≅ ∠lno and she is trying to prove that ol ≅ on. triangle oln, where angle oln is congruent to angle lno nina made two errors in the proof. identify and correct the errors.
Answers: 1
question
Mathematics, 22.06.2019 04:30
Joe had 25 pencils he divided them into 5 pieces how many pieces does he have left
Answers: 1
You know the right answer?
Suppose worker A averages 100 picks per hour, worker B averages 60 picks per hour, and worker C aver...
Questions