Mathematics, 12.06.2020 05:57 ella3714

To manufacture an automobile requires painting, drying, and polishing. Epsilon Motor Company produces three types of cars, the Delta, the Beta, and the Sigma. Each Delta requires 16 hours for painting, 5 hours for drying, and 2 hours for polishing. A Beta requires 22 hours for painting, 7 hours for drying, and 3 hours for polishing, and
a Sigma requires 6 hours for painting, 1 hour for drying, and 5 hours for polishing. If the company has 278 hours for painting, 76 hours for drying, and 91 hours for
polishing per month, how many of each type of car are produced?
Select the correct choice below and fill in any answer boxes within your choice.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
What is the volume of a rectangular prism if the length is 10.4 mm the width is 5 mm in the height is 8 mm
Answers: 1
question
Mathematics, 21.06.2019 17:00
Find the measure of the interior angles of the following regular polygons: a triangle, a quadrilateral, a pentagon, an octagon, a decagon, a 30-gon, a 50-gon, and a 100-gon.
Answers: 1
question
Mathematics, 21.06.2019 19:30
Factor the following expression. 27y3 – 343 a. (3y + 7)(9y2 + 2ly + 49) b. (3y – 7)(9y2 + 2ly + 49) c. (3y – 7)(932 – 217 + 49) d. (3y + 7)(92 – 2ly + 49)
Answers: 1
question
Mathematics, 22.06.2019 01:30
How do you write 0.5% as a fraction
Answers: 1
You know the right answer?
To manufacture an automobile requires painting, drying, and polishing. Epsilon Motor Company produce...
Questions
question
Physics, 18.03.2021 22:50
question
Biology, 18.03.2021 22:50
question
English, 18.03.2021 22:50
question
Mathematics, 18.03.2021 22:50
question
Mathematics, 18.03.2021 22:50