subject
Mathematics, 07.06.2020 05:57 natalie1755

A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 minutes (unit time). The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 minutes. Given this information, (a) what is the percent learning rate and (b) what is the total cumulative time to produce all 17 welded assemblies

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
To which set of numbers does the number –5 belong? select all that apply. integers natural numbers rational numbers real numbers whole numbers
Answers: 1
question
Mathematics, 21.06.2019 23:50
If np3 /nc2 = 6, find the value of n
Answers: 2
question
Mathematics, 22.06.2019 00:30
Arandomized controlled trial is designed to evaluate the effect of metoprolol in patients with heart failure. while preparing for statistical analysis, the researcher reviews some common types of statistical errors. which of the following statements is true regarding a type i error in a clinical study? a. the study is not significantly powered to detect a true difference between study groups. bthe null hypothesis is true but is rejected in error. c. the null hypothesis is false but is accepted in error. d. type i error is also known as beta and is usually 0.1 or 0.2. e. type i error depends on the study's confidence interval.
Answers: 1
question
Mathematics, 22.06.2019 02:30
What is the simplified form of 400x100 ? o 200x10 o 200x50 0 20x10 • 20x50
Answers: 1
You know the right answer?
A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly ta...
Questions
question
Mathematics, 09.09.2019 17:20
question
English, 09.09.2019 17:20
question
History, 09.09.2019 17:20