subject
Mathematics, 24.05.2020 17:58 angelgrant780

Universal Pet House sells vinyl doghouses and treated lumber doghouses. It takes the company 5
hours to build a vinyl doghouse and 2 hours to build a treated lumber doghouse. The company
dedicates 50 hours every week towards building doghouses. It takes an additional hour to paint each
vinyl doghouse and an additional 2 hours to assemble each treated lumber doghouse. The company
dedicates 30 hours every week towards assembling and painting doghouses.
Write a system of equations that represent the production time needed to build each doghouse and
the production time needed for painting and assembling each doghouse. Use x to represent the
number of vinyl doghouses and y to represent the number of treated lumber doghouses.
Build Time:
Paint/Assembly Time:

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
A20? -foot ladder is placed against a vertical wall of a? building, with the bottom of the ladder standing on level ground 19 feet from the base of the building. how high up the wall does the ladder? reach?
Answers: 1
question
Mathematics, 21.06.2019 18:00
Aman is 6 feet 3 inches tall. the top of his shadow touches a fire hydrant that is 13 feet 6 inches away. what is the angle of elevation from the base of the fire hydrant to the top of the man's head?
Answers: 2
question
Mathematics, 21.06.2019 19:40
What is the range of the function? f(x)=-2|x+1|? a. all real numbers. b. all real numbers less than or equal to 0. c. all real numbers less than or equal to 1. d. all real numbers greater than or equal to 1
Answers: 2
question
Mathematics, 21.06.2019 22:20
The coordinates of vortex a’ are (8,4) (-4,2) (4,-,4) the coordinates of vortex b’ are (6,6)(12,-,12)(12,12) the coordinates of vortex c’ are(-2,,12)(4,12)(12,-4)
Answers: 3
You know the right answer?
Universal Pet House sells vinyl doghouses and treated lumber doghouses. It takes the company 5
...
Questions