subject
Mathematics, 21.05.2020 23:04 shyshy6184

A national manufacturer of ball bearings is experimenting with two different processes for producing precision ball bearings. It is important that the diameters be as close as possible to an industry standard. The output from each process is sampled and the average error from the industry standard is calculated. The results are presented below (all are sample data). Process A Process B Mean 0.002 mm 0.0026 mm Standard Deviation 0.0001 mm 0.00012 mm Sample Size 12 14 What are the degrees of freedom

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
Aswimming pool is a rectangle with semicircles on the end. the rectangle is 12 meters wide and 30 meters long. the diameter and width of the swimming pool are equal. sketch and label an overhead diagram of the swimming pool. find the area of the swimming pool floor.
Answers: 1
question
Mathematics, 21.06.2019 18:30
Divide. write in the simplest form. 4 1/6 divided by 10
Answers: 2
question
Mathematics, 21.06.2019 19:00
What are the solutions of the equation? 5z^2 + 9z - 2 = 0 a. 1, -2 b. 1, 2 c. 1/5, -2 d. 1/5, 2
Answers: 2
question
Mathematics, 21.06.2019 19:50
Asequence is defined recursively using the formula f(n + 1) =f(n) - 5. which sequence could be
Answers: 1
You know the right answer?
A national manufacturer of ball bearings is experimenting with two different processes for producing...
Questions
question
Mathematics, 07.05.2021 21:20
question
Chemistry, 07.05.2021 21:20
question
Social Studies, 07.05.2021 21:20
question
Mathematics, 07.05.2021 21:20
question
Arts, 07.05.2021 21:20
question
Mathematics, 07.05.2021 21:20