subject
Mathematics, 21.05.2020 04:00 twalters88

1. To evaluate the defect rate of its memory chips, an integrated circuit manufacturer
tests every 100th chip off the production line. Out of 10 chips tested, one chip is found
to be defective. The manufacturer concludes that 3 chips out of 3,000 will be defective.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Which point is a solution to the inequality shown in this graph (-3,-3)(3,-1)
Answers: 2
question
Mathematics, 21.06.2019 16:30
The angles below are supplementary. what is the value of x? a pair of supplementary angles is shown. one angle measures 7x + 33, and the other angle measures 70. 5.3 8.14 11 14.7
Answers: 1
question
Mathematics, 21.06.2019 18:30
Find an equation of the line perpendicular to the graph of 28x-7y=9 that passes through the point at (4,1)
Answers: 2
question
Mathematics, 21.06.2019 23:00
In trapezoid abcd, ac is a diagonal and ∠abc≅∠acd. find ac if the lengths of the bases bc and ad are 12m and 27m respectively.
Answers: 3
You know the right answer?
1. To evaluate the defect rate of its memory chips, an integrated circuit manufacturer
tests e...
Questions
question
French, 18.11.2020 20:00
question
Biology, 18.11.2020 20:00