subject
Mathematics, 05.05.2020 17:36 liquidmana42

A high school student named David Merrell did a study of how music affects the ability of rats to run a maze. He trained 71 rats to run a maze. Next he randomly divided the rats into three groups. Each group had 23 or 24 rats. For the next month, one group of rats listened all day to heavy metal music by the group Anthrax. One group listened all day to Mozart. One group never heard music. The rats ran the same maze three times a week for a month. The response variable is the time in seconds to complete the maze. By the end of the month he compared the average run time for each treatment group to the average run time for the control group. The Anthrax group was much slower at running the maze. The Mozart group was much faster. The differences are statistically significant at the 1% level. Run times are not heavily skewed in any group. What conclusion can we draw from these results? Group of answer choices The sample size is too small to draw a valid conclusion. He has proven that heavy metal music causes rats to run slower and classical music causes rats to run faster. There is evidence that heavy metal music causes rats to run slower and classical music causes rats to run faster. We cannot draw any conclusion because of flaws in the experiment design.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
Which shows the correct solution of the equation 1/2a+2/3b=50, when b=30?
Answers: 1
question
Mathematics, 21.06.2019 21:20
In 2009, there were 1570 bears in a wildlife refuge. in 2010, the population had increased to approximately 1884 bears. if this trend continues and the bear population is increasing exponentially, how many bears will there be in 2018?
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
question
Mathematics, 21.06.2019 21:30
Consider the following equation. 1/2x^3+x-7=-3sqrtx-1 approximate the solution to the equation using three iterations of successive approximation. use the graph below as a starting point. a. b. c. d.
Answers: 3
You know the right answer?
A high school student named David Merrell did a study of how music affects the ability of rats to ru...
Questions
question
Biology, 06.04.2020 19:33
question
Spanish, 06.04.2020 19:33