KHDM DCM
3.65 g = [?] mg
Enter
...
Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:00
Me with this assignment ! i only partially understand, so explain. also it's a work sample. at the championship bike race, steve and paula were fighting for first place. steve was 175 feet ahead of paula and had only 300 feet left to go. he was very tired and was going only 9 feet per second. paula was desperate to catch up and was going 15 feet per second. who won the bike race and by how far did she/he win?
Answers: 1
Mathematics, 22.06.2019 00:30
Which of these side lengths could form a triangle a) 2 cm , 2 cm , 4 cm b) 3 cm , 5 cm , 10 cm c) 3 cm , 4 cm , 5 cm d) 4 cm , 8 cm , 15 cm
Answers: 3
Mathematics, 22.06.2019 02:00
Aflagpole broke in a storm. 77 7 meters are still sticking straight out of the ground, where it snapped, but the remaining piece has hinged over and touches the ground at a point 2424 24 meters away horizontally
Answers: 1
Mathematics, 22.01.2022 15:20
Chemistry, 22.01.2022 15:20
Mathematics, 22.01.2022 15:20
Biology, 22.01.2022 15:20
Physics, 22.01.2022 15:20
Mathematics, 22.01.2022 15:20
Mathematics, 22.01.2022 15:20