subject
Mathematics, 05.05.2020 08:27 jeff6284

Use the following to answer 21-22 The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the throughput time to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body paint work on each are as follows: Car Body Work (hours) Paint (hours) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 Q21) What is the optimum sequence (first car to last)

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
Which point on the x-axis lies on the line that passes through point c and is parallel to lino ab?
Answers: 1
question
Mathematics, 21.06.2019 23:00
Which graph represents the linear function below? y-3=1/2(x+2)
Answers: 2
question
Mathematics, 21.06.2019 23:30
Aparking garage charges $1.12 for the first hour and 0.50 for each additional hour. what is the maximum length of time tom can park in the garage if we wishes to play no more than $5.62
Answers: 1
question
Mathematics, 22.06.2019 01:30
What is the surface area of the sphere?
Answers: 1
You know the right answer?
Use the following to answer 21-22 The operations manager of a body and paint shop has five cars to s...
Questions
question
Mathematics, 11.11.2020 20:50
question
Geography, 11.11.2020 20:50
question
Physics, 11.11.2020 20:50