subject
Mathematics, 05.05.2020 22:16 zacharoo10

The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and absorption of 4.2%, and 899 lb/yd3 of sand having a moisture content of 5.7% and absorption of 1.4%, and 244 lb/yd3 of free water. What is the weight of the mixing water per cubic yard that should be used at the job site?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 19:30
How long must $542 be invested at a rate of 7% to earn $303.52 in interest? in a easier way
Answers: 1
question
Mathematics, 21.06.2019 20:10
Which function has the domain x> -11?
Answers: 1
question
Mathematics, 22.06.2019 00:30
Jaxon has s packs of 8 crazy straws. he divided the crazy straws into 2 equal bags. now, he has 224 crazy straws in each bag. how many packs of crazy straws did jaxon start with?
Answers: 1
question
Mathematics, 22.06.2019 03:30
Mr. piper is driving peter, roddy, and scott home from school. all of them want to ride in the front seat. how can he make a fair decision about who rides in the front seat?
Answers: 1
You know the right answer?
The design of a concrete mix requires 2,314 lb/yd3 of gravel having a moisture content of 3.5% and a...
Questions