Provide the width of project duration range (not dates) at plus and minus ten percent about the probability of expected completion time based on PERT and MCS results. For example, if the expected completion time is d days, and the corresponding probability is p%, find the duration range corresponding to p-10% to p 10% probability

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Asegment in the complex plane has a midpoint at 7 – 2i. if the segment has an endpoint at 11 – 3i, what is the other endpoint?
Answers: 1
question
Mathematics, 21.06.2019 19:10
Which graph represents the function g(x) = |x + 4| + 2?
Answers: 1
question
Mathematics, 21.06.2019 20:00
Three baby penguins and their father were sitting on an iceberg 0.50.50, point, 5 meters above the surface of the water. the father dove down 4.74.74, point, 7 meters from the iceberg into the water to catch dinner for his kids. what is the father penguin's position relative to the surface of the water?
Answers: 2
question
Mathematics, 21.06.2019 21:00
Can someone answer this question for me
Answers: 1
You know the right answer?
Provide the width of project duration range (not dates) at plus and minus ten percent about the prob...
Questions
question
Mathematics, 20.09.2019 06:30
question
Chemistry, 20.09.2019 06:30