subject
Mathematics, 27.04.2020 02:09 alanizyc

Lamar Watson checks 400 samples per hour of calculations produced by The Math Company. The production process is in control of 1 percent or less of the samples is defective. At 6:00 am Watson found 3 of 400 samples defective. At 7:00 am he found 6. At 8:00 am he found 1. What percent of each inspection was defective? Was the process in or out of control each hour?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 20.06.2019 18:02
10 pointsthe roof of a house has a slope of 5/12. what is the width of the house if the height of the roof is 8 feet?
Answers: 1
question
Mathematics, 21.06.2019 17:30
17 in long 1.3 ft wide and 8in high what is the volume
Answers: 1
question
Mathematics, 21.06.2019 18:10
Points a, b, and c form a triangle. complete the statements to prove that the sum of the interior angles of triangle abc is 180
Answers: 1
question
Mathematics, 21.06.2019 18:30
An arc subtends a central angle measuring 7pi/4 radians what fraction of the circumference is this arc?
Answers: 1
You know the right answer?
Lamar Watson checks 400 samples per hour of calculations produced by The Math Company. The productio...
Questions
question
Mathematics, 12.12.2021 21:10