subject
Mathematics, 25.04.2020 01:03 dsteele3642

A small manufacturing plant produces two kinds of bicycles—single speed and ten-speed. The plant can manufacture up to 400 of the single speed bicycles and up to 500 of the ten-speed bicycles per month, but it can only manufacture a total of 650 of both kinds every month. It takes 40 man-hours to manufacture a single-speed bicycle and 80 man-hours for the ten-speed; there are 44,000 man-hours available per month. The profit on a single-speed bicycle is $20 and the profit on a ten-speed bicycle is $30.

Determine the production schedule that will maximize the total monthly profit z from the manufacture and sale of x single speed and y ten-speed bicycles.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Data was collected on myrtle beach for 11 consecutive days. each day the temperature and number of visitors was noted. the scatter plot below represents this data. how many people visited the beach when the temperature was 84 degrees?
Answers: 1
question
Mathematics, 21.06.2019 17:30
In a probability experiment, karen flipped a coin 76 times. the coin landed on heads 32 times. what percentage of the coin flips resulted in tails? round to the nearest percent. a. 58% b. 65% c. 42% d. 60%
Answers: 2
question
Mathematics, 21.06.2019 23:40
30 ! the graph shows the number of siblings different students have. select from the drop-down menus to correctly complete the statement.
Answers: 1
question
Mathematics, 22.06.2019 02:30
The slope of the line whose equation is 3y = 2x - 3 is 2 2/3 3/2
Answers: 1
You know the right answer?
A small manufacturing plant produces two kinds of bicycles—single speed and ten-speed. The plant can...
Questions
question
Mathematics, 23.08.2021 08:10
question
Mathematics, 23.08.2021 08:10
question
Mathematics, 23.08.2021 08:10