Mathematics, 23.04.2020 19:33 randlemccray4305
Jed needs to estimate the value of StartFraction 4.32 times 10 Superscript negative 4 Baseline Over 8.71 times 10 Superscript negative 9 Baseline EndFraction. Which statements should he consider? Check all that apply.
4.32 divided by 8.71 is approximately 2.
4.32 divided by 8.71 is approximately 0.5.
The answer will be very small because Negative 4 minus 9 = negative 13.
The number will be large because Negative 4 minus (negative 9) = 5.
He will need to rewrite the preliminary result in scientific notation.
The number will be small because the exponent will be a fraction.
Answers: 1
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:20
Which strategy is used by public health to reduce the incidence of food poisoning?
Answers: 2
Jed needs to estimate the value of StartFraction 4.32 times 10 Superscript negative 4 Baseline Over...
Business, 08.08.2021 03:40
Chemistry, 08.08.2021 03:40
Mathematics, 08.08.2021 03:40
Mathematics, 08.08.2021 03:40
Mathematics, 08.08.2021 03:50
Biology, 08.08.2021 03:50
Social Studies, 08.08.2021 03:50
Biology, 08.08.2021 03:50
History, 08.08.2021 03:50
Physics, 08.08.2021 03:50
Mathematics, 08.08.2021 03:50
Mathematics, 08.08.2021 03:50