subject
Mathematics, 23.04.2020 09:00 samueldfhung

The line plot shows the number of hours students in Mrs. Timberlakeā€™s class worked on a project.

A line plot titled Hours Spent on Project. A number line goes from 1 to 5 and represents the number of hours. There are 3 marks above 1, 2 above 2, 5 above 3, 3 above 4, 2 above 5.

How many students are included in the data?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Given the parent function of [tex]f(x)=x^4[/tex], what change will occur when the function is changed to [tex]f(\frac{1}{2} x)[/tex]?
Answers: 3
question
Mathematics, 21.06.2019 18:20
The number if marbles of different colors stored in a hat is listed below: 4 red marbles 10 green marbles 7 blue marbles. without looking in the hat, dan takes out a marble at random. he replaces the marble and then takes out another marble from the hat. what is the probability that dan takes out a blue marble in both draws?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Which statement shows that 6.24 is a rational number? a. 6.24 = 6.242424 b. 6.24 = 6.24 c. 6.24 = 68ā„33 d. 6.24 = 66ā„25
Answers: 1
question
Mathematics, 21.06.2019 23:00
Events a and b are independent. the probability of a occurring is 2/5. the probability of b occurring is 1/4. what is p(a and b)?
Answers: 2
You know the right answer?
The line plot shows the number of hours students in Mrs. Timberlakeā€™s class worked on a project.
Questions