subject
Mathematics, 14.04.2020 23:52 Bunnybear8099

Company A uses a new production method to manufacture aircraft altimeters. A simple random sample of new altimeters resulted in errors listed below. Use a 0.05 level of significance to test the claim that the new production method has errors with a standard deviation greater than 32.2 ft, which was the standard deviation for the old production method. If it appears that the standard deviation is greater, does the new production method appear to be better or worse than the old method? Should the company take any action?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
The axis of symmetry for the graph of the function f(x)=1/4^2+bx +10 is x=6. what is the value of b?
Answers: 1
question
Mathematics, 21.06.2019 15:40
The transitive property of equality states that: o if a = b, then bra o if a = b, then ac = bc o if a = b and b= c, then a = if a = b and c= c, then a + b = b + c
Answers: 2
question
Mathematics, 21.06.2019 17:00
If i have a 24 in loaf of bread and i cut it into two pieces one 9 in how long was the other
Answers: 2
question
Mathematics, 21.06.2019 18:30
It took alice 5 5/6 hours to drive to her grandparents' house for . on the way home, she ran into traffic and it took her 7 3/8 hours. how much longer did the return trip take? write your answer as a proper fraction or mixed number in simplest form. the trip home took __hours longer. ?
Answers: 1
You know the right answer?
Company A uses a new production method to manufacture aircraft altimeters. A simple random sample of...
Questions
question
Chemistry, 14.01.2020 05:31
question
Chemistry, 14.01.2020 05:31