subject
Mathematics, 14.04.2020 20:02 Jxlly9338

A craftsman builds two kinds of birdhouses, one for wrens and one for bluebirds. Each wren birdhouse takes 3 hours of labor and 4 units of lumber. Each bluebird house requires 2 hours of labor and 10 units of lumber. The craftsman has available 80 hours of labor and 100 units of lumber, and he wants to build at least 6 wren houses. Wren houses profit $8 each and bluebird houses profit $16 each. How many of each kind of birdhouses should be built in order to maximize total profit? Formulate this as a linear programming problem (i. e., DO NOT solve it.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
The parabola opens: y=√x-4 (principal square root) up down right left
Answers: 1
question
Mathematics, 21.06.2019 22:30
Consider an example of a deck of 52 cards: example set of 52 playing cards: 13 of each suit clubs, diamonds, hearts, and spades ace 2 3 4 5 6 7 8 9 10 jack queen king clubs diamonds hearts spades what is the probability of drawing three queens from a standard deck of cards, given that the first card drawn was a queen? assume that the cards are not replaced.
Answers: 1
question
Mathematics, 22.06.2019 01:50
Write the point-slope form of an equation of the line through the points (-2, -3) and (-7, 4).
Answers: 1
question
Mathematics, 22.06.2019 03:00
Plz ! define the type of sequence below. -2,0,2,4,6 a. both arithmetic and geometric b. arithmetic c. neither arithmetic nor geometric d. geometric
Answers: 1
You know the right answer?
A craftsman builds two kinds of birdhouses, one for wrens and one for bluebirds. Each wren birdhouse...
Questions
question
Chemistry, 03.07.2021 01:00
question
Mathematics, 03.07.2021 01:00
question
Mathematics, 03.07.2021 01:00