subject
Mathematics, 07.04.2020 23:38 roger93

A construction firm bids on two different contracts. Let E1 be the event that the bid on the first contract is successful, and define E2 analogously for the second contract. Suppose that P(E1) = 0.3 and P(E2) = 0.7 and that E1 and E2 are independent events.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 22.06.2019 00:00
Afair die is cast four times. calculate the probability of obtaining exactly two 6's round to the nearest tenth of a percent
Answers: 1
question
Mathematics, 22.06.2019 00:30
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
question
Mathematics, 22.06.2019 02:00
Aculinary club earns $1360 from a dinner service. they sold 45 adult meals and 80 student meals. an adult meal costs twice as much as a student meal. what is the cost of an adult meal?
Answers: 2
question
Mathematics, 22.06.2019 02:30
Using the rise/run counting method, the slope of the line is
Answers: 1
You know the right answer?
A construction firm bids on two different contracts. Let E1 be the event that the bid on the first c...
Questions
question
Mathematics, 23.04.2020 00:03
question
Geography, 23.04.2020 00:03
question
Computers and Technology, 23.04.2020 00:03
question
Mathematics, 23.04.2020 00:04