subject
Mathematics, 07.04.2020 23:04 nadikadiaz1

A company manufactures chairs at a cost of $70 each. The following are probabilities of defective chairs in a given production run: probability of 1% defective chairs: 40%; probability of 2% defective chairs: 35%; probability of 3% defective chairs: 25%. When a defective chair is detected, it must be removed from the assembly line and replaced. This process adds an extra $10 to the cost of the replaced chair. What is the expected cost to the company of a batch of 500 chairs?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:40
Which number produces a rationale number when multiplied by 1/5
Answers: 1
question
Mathematics, 21.06.2019 20:30
Aswimming pool measures 22ft by 12ft and is 4ft deep. if the pool is being filled at 2.5 cubic ft per minute, how long will it take to fill the pool?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Adistribution has the five-number summary shown below. what is the third quartile, q3, of this distribution? 22, 34, 41, 55, 62
Answers: 2
question
Mathematics, 21.06.2019 23:00
Perry observes the opposite parallel walls of a room in how many lines do the plains containing the walls intersect
Answers: 1
You know the right answer?
A company manufactures chairs at a cost of $70 each. The following are probabilities of defective ch...
Questions
question
Chemistry, 23.03.2021 14:50
question
Social Studies, 23.03.2021 14:50
question
Mathematics, 23.03.2021 14:50
question
Social Studies, 23.03.2021 14:50