Mathematics, 07.04.2020 04:12 grantjaylynn
A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose the project network is given and the critical path is identified on the network.
2) Suppose the normal time, crash time, and the associated cost for each activity is given.
You have been asked by your supervisor to prepare a research paper that addresses the follow criteria:
a) What is the probability that the project will be completed in 32 weeks or less?
b) If the project is to be shortened by four days, list the process you would take to determine which activities, in order of reduction, would be shortened and the resulting cost.
c) Describe project cost and the requirements for its determination and application ina production facility.
d) Analyze the implications of changes in the parameters of project timing and cost determination.
e) Evaluate the application of project cost and timing concepts on a firm's business operations. What is the probability that the project will be completed in 32 weeks or less?
Answers: 3
Mathematics, 21.06.2019 17:10
Consider the functions below. function 1 function 2 function 3 select the statement which is true about the functions over the interval [1, 2] a b function 3 has the highest average rate of change function 2 and function 3 have the same average rate of change. function and function 3 have the same average rate of change function 2 has the lowest average rate of change d.
Answers: 3
Mathematics, 21.06.2019 21:50
The value of the expression 16-^3/4 8 1/8 -6 6 1/40 1/64
Answers: 1
Mathematics, 21.06.2019 23:30
Dawn is selling her mp3 player for 3 4 of the original price. the original price for the mp3 player was $40. how much is she selling her mp3 player for?
Answers: 1
Mathematics, 22.06.2019 00:00
Corresponding angles are a. always b. sometimes c. never congruent
Answers: 1
A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose...
1) Suppose...
Health, 27.06.2020 06:01
Physics, 27.06.2020 06:01
Mathematics, 27.06.2020 06:01
Computers and Technology, 27.06.2020 06:01
Mathematics, 27.06.2020 06:01
Mathematics, 27.06.2020 06:01
Mathematics, 27.06.2020 06:01
Mathematics, 27.06.2020 06:01