subject
Mathematics, 06.04.2020 22:07 leo4687

It costs more to produce defective items - since they must be scrapped or reworked - than it does to produce non-defective items. This simple fact suggests that manufacturers should ensure the quality of their products by perfecting their production processes instead of depending on inspection of finished products (Deming, 1986). In order to better understand a particular metal stamping process, a manufacturer wishes to estimate the mean length of items produced by the process during the past 24 hours.

a. How many parts should be sampled in order to estimate the population mean to within 0.1 millimeter (mm) with 90% confidence?
b. Time permits the use of a sample size no larger than 100. If a 90% confidence interval for the mean is constructed with n = 100, will it be wider or narrower than would have been obtained using the sample size determined in part a?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
This figure consists of a rectangle and semicircle. what is the perimeter of this figure use 3.14 for pi 60.84m 72.84m 79.68m 98.52m
Answers: 2
question
Mathematics, 21.06.2019 18:20
Do social recommendations increase ad effectiveness? a study of online video viewers compared viewers who arrived at an advertising video for a particular brand by following a social media recommendation link to viewers who arrived at the same video by web browsing. data were collected on whether the viewer could correctly recall the brand being advertised after seeing the video. the results are given below.correctly recalled the brandarrival 409153browsing20484b. conduct the hypothesis test, using the 0.025 level of significance.what is the value of the test statistic? χ2stat=what is the p-value? p-value=is this value significant atα=0.025?
Answers: 2
question
Mathematics, 21.06.2019 22:30
What is 1.5% of 120 or what number is 1.5% of 120
Answers: 2
question
Mathematics, 22.06.2019 00:30
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
You know the right answer?
It costs more to produce defective items - since they must be scrapped or reworked - than it does to...
Questions
question
Business, 30.06.2019 16:10
question
Chemistry, 30.06.2019 16:10