subject
Mathematics, 03.04.2020 12:50 diamondktaylor

Adam is going to make concrete. He is going to use 180 kg of cement. 375 kg of sand. 1090 kg of stone. Cement, sand and stone are sold in bags.

1 bag cement 25 kg
1 bag sand 22.5 kg
1 bag stone 50 kg

Adam already has
8 bags of cement
19 bags of sand
20 bags of stone

Work out what bags he needs to buy to make the concrete.

Working must be shown please.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
The base of a triangle exceeds the height by 9 inches. if the area is 180 square inches, find the length of the base and the height of the triangle.
Answers: 1
question
Mathematics, 21.06.2019 19:00
After t seconds, a ball tossed in the air from the ground level reaches a height of h feet given by the equation h = 144t-16t^2. after how many seconds will the ball hit the ground before rebounding?
Answers: 2
question
Mathematics, 21.06.2019 19:10
In the triangles, bc =de and ac fe.if the mzc is greater than the mze, then ab isdfelth
Answers: 2
question
Mathematics, 21.06.2019 19:30
Order the measurements from the least to the greatest. 2,720 ml , 24.91 l , 0.0268 kl
Answers: 1
You know the right answer?
Adam is going to make concrete. He is going to use 180 kg of cement. 375 kg of sand. 1090 kg of ston...
Questions
question
Mathematics, 24.09.2019 05:10
question
Mathematics, 24.09.2019 05:10
question
Mathematics, 24.09.2019 05:10
question
Mathematics, 24.09.2019 05:10
question
Mathematics, 24.09.2019 05:10