subject
Mathematics, 02.04.2020 12:50 eduardo60

1 cubic meter of concrete has a wight of 2400 kg. 15% of the concrete is water. The rest of the ingredients are cerment, sand and stone. The weights are in a ratio of 1:2:5. Work out the weight of cement, sand and stone in the 1 cubic meter of concreteHelp me please i have a test coming up

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Atriangle with all sides of equal length is a/an triangle. a. right b. scalene c. equilateral d. isosceles
Answers: 2
question
Mathematics, 21.06.2019 19:00
Which shows one way to determine the factors of 4x3 + x2 – 8x – 2 by grouping?
Answers: 1
question
Mathematics, 21.06.2019 21:30
If you flip a coin 3 times, what is the probability of flipping heads 3 times? a. p(3 heads) = 3/8 b. p(3 heads) = 1/6 c. p(3 heads) = 1/8 d. p(3 heads) = 1/2
Answers: 2
question
Mathematics, 21.06.2019 22:00
Here is my question! jayne is studying urban planning and finds that her town is decreasing in population by 3% each year. the population of her town is changing by a constant rate.true or false?
Answers: 2
You know the right answer?
1 cubic meter of concrete has a wight of 2400 kg. 15% of the concrete is water. The rest of the ingr...
Questions
question
Mathematics, 17.12.2020 17:00
question
Biology, 17.12.2020 17:00
question
Mathematics, 17.12.2020 17:00