subject
Mathematics, 30.03.2020 21:01 lexiscaraballo12

A construction worker needs to move 120 ft- of dirt
by using a wheelbarrow. One wheelbarrow load
holds 8 ft of dirt and each load takes him 10
minutes to complete. One correct way to figure out
the number of hours he would need to complete
this job is

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:20
If f(x)=-x^2+6x-1 and g(x)=3x^2-4x-1,find(f+g)(x)
Answers: 1
question
Mathematics, 21.06.2019 21:00
The description below represents function a and the table represents function b: function a the function is 5 more than 3 times x. function b x y −1 2 0 5 1 8 which statement is correct about the slope and y-intercept of the two functions? (1 point) their slopes are equal but y-intercepts are not equal. their slopes are not equal but y-intercepts are equal. both slopes and y intercepts are equal. neither slopes nor y-intercepts are equal.
Answers: 3
question
Mathematics, 21.06.2019 23:20
This graph shows which inequality? a ≤ –3 a > –3 a ≥ –3 a < –3
Answers: 1
question
Mathematics, 22.06.2019 01:00
The triangles are similar. what is the value of x? enter your answer in the box.
Answers: 1
You know the right answer?
A construction worker needs to move 120 ft- of dirt
by using a wheelbarrow. One wheelbarrow loa...
Questions
question
Mathematics, 24.03.2021 01:00
question
Mathematics, 24.03.2021 01:00
question
Social Studies, 24.03.2021 01:00
question
Mathematics, 24.03.2021 01:00